NORTHSTOWE COHOUSING, CAMBRIDGE

Client: TOWN & Hill Group
Completion: Ongoing
Senior Team: Catherine Xavier, Eric Molloy 

Project Description:

Northstowe is a brand new community, less than 30 minutes from Cambridge city centre. The site is a parcel located south of the urban centre and it comprises of 145 residential dwellings. The scheme was progressed from RIBA Stage 1 to 3 and in March 2026 it gained Reserved Matters approval.

The project includes two independent cohousing communities, a first on a single development, and these interface a multi-functional pedestrian priority street. This encompasses a central plaza with seating and tree planting, community growing space, a mini orchard and ‘play on the way’ features. It was imperative that we closely collaborated with the architect (MOLE Architects) to ensure that the living environment was seamless inside and out.

Residential parcels were also designed around areas of communal open space, with tree lines streets and integrated SuDs features which were designed with Civic Civil Engineers. There was an emphasis on connecting the site with strategic open space to the south and town centre to the north.

Visualisations produced by MOLE and OReilly Studio.

Main Tasks:

  • Concept design, client and team collaboration to develop the design.
  • Community engagement – Codesign sessions/workshops virtually and in-person.
  • LPA discussions and Design Review Panel.
  • Client engagement to align budget.

Key Considerations:

  • Detailed discussions with the LPA.
  • Tight client budget to balance with Design Code compliance.
  • Integration of SuDs features throughout.
  • Balancing LPA, client and future residents expectations to form a coherent scheme